Renewable Energy

Activity/Program

The result

1. Installation of solar cell panel program. 1.Usage of solar cell generated electricity in 4 Locations, which are

1.1 Division of Buildings and Grounds  

– Solar cell of 3 kW that generate 4,920 kWh/year are installed.

– Solar cell of 2.4 kW that generate 576 kWh/year are installed.

1.2 Footpath linking dormitories

–  Solar cell of 1kW solar cells that generate
2,190 kWh/ year are installed

1.3Exercise Tracks

–  Solar power lamps installed at Sura  reservoir
60 Watts of 10 lamps that  generate 219 kWH/year.

1.4 Sirindhorn vitsawapat

–  Installed the solar cell of 10kW generate 16,800 kWH/year

1.5 Municipal solid waste plant

–  Solar cell of 2.50kW that generate 5,475 kWh/ year are installed.

This will save the electricity by 30,180 kWH/year, equivalent to the carbon footprint of 25 Tons CO2 eq./year.

1.Wind Power 2. Wind power of 0.3 kW that generate 54 kWh/year are installed.
2.Biodiesel prototype plant. 1. A prototype for learning, studying and research of students and external organizations.

3. Capacity 240 kWH

3. Biogas system from the pig farm. 1. Biogas from the university’s pig farm of 5KW. 
This will save the electricity by 3,650 kWH/year, equivalent to the carbon footprint of 3 Tons CO2eq./year
4.Biomass Power 1. A prototype for learning, studying and research of students and external organizations. Capacity 100 kWH
5.Gasification power plant

– 1 MW From RDF

– 500 kW From Infectious waste

1. Gasification power plant for generating electricity from RDF and from Infectious waste.

2. In – process testing It is expected to save 4.36 x103 MW of electricity per year.